Albuquerque Demolition Co
Older adobe and masonry building in Albuquerque, New Mexico being evaluated for demolition

Demolishing a Pre-1945 Building in Albuquerque: Where Historic Review Can Enter

Albuquerque Demolition Co Team

July 1, 2026 | 6 min read

Albuquerque is a city of 20th-century neighborhoods, and the older ones carry real protections. If your building dates from before 1945, or sits near a historic district, the demolition permit may not be a formality. This article explains where review can come up. It is general information only, and the City's current rules are the authority.

Why age matters

Buildings of a certain age are more likely to be flagged for historic preservation staff review before the City issues a demolition permit. Pre-1945 construction is a common trigger point to ask about. Whether yours is caught depends on its age, its location and whether it has any formal designation.

Areas where review often comes up

  • Nob Hill and Highland: Many pre-war bungalows and commercial buildings along Central Ave. Staff review may apply to older structures.
  • Monte Vista and College View: These historic districts are close to Nob Hill. Parcels inside or bordering them may face a different review level.
  • Old Town: The Historic Protection Overlay can require review by the Landmarks Commission and a Certificate of Appropriateness for exterior changes or demolition.
  • Downtown core: Older commercial buildings may be subject to review depending on designation and scope.

What the Landmarks Commission does

The Landmarks Commission reviews certain proposals affecting designated landmarks and properties in protected areas. For work that needs it, a Certificate of Appropriateness is the approval you are seeking. If it is denied or conditioned, the project may have to change or wait, which is why timing matters.

Practical steps

  • Find the building's approximate construction date from county records or past documents.
  • Ask City Planning whether your parcel is in a historic district or overlay, or individually designated.
  • Ask whether an interior-only or partial demolition is treated differently from a full teardown.
  • Plan the schedule with a review period in mind and avoid committing crews before approvals.

We can document the existing structure, discuss selective or partial approaches that preserve what must stay, and sequence hazardous-material work around review. Call Albuquerque Demolition Co at (714) 333-0178.

Get an Albuquerque demolition quote

Tell us about your property and timeline. Albuquerque Demolition Co will outline the permit, asbestos and utility steps and send a clear written quote.